Giancarlo Stanton Currently Behind Schedule
Feb 16, 2025, 4:42 PM ET
New York Yankees outfielder Giancarlo Stanton (elbow) was fantastic during the postseason but is currently behind schedule at the start of spring training. The veteran slugger is currently being held back due to elbow soreness. This doesn't sound like a long-term issue, but the Yankees are also going to be cautious with their veteran slugger. The assumption is that Stanton will be fine in time for Opening Day, but more information will be revealed as time goes on. This injury might push Stanton down on some draft boards, but it's also worth noting that Stanton is coming off a fairly decent 2024 season. His days of being an All-Star slugger are probably behind him, but Stanton can still be a viable option in this Yankees lineup.--Andy WebbSource: Chris KirschnerComments · Join ChatOpen App
More Recent News
Phillies, Yankees, Blue Jays Monitoring Randy Arozarena
Source: Randy Arozarena, the top position player on the free-agent market, continues to be monitored by several teams, including the Phillies, Yankees, Blue Jays with the CBA set to expire in just a few hours.
— Francys Romero (@FrancysRomero) November 30, 2026
Nov 30, 2026, 2:11 PM ET
Otto Lopez Drawing Trade Interest
Latest notes:
— Robert Murray (@ByRobertMurray) November 30, 2026
- Industry reaction to AJ Preller and the Padres’ spending spree.
- Inside Michael King’s market.
- Details on Alec Burleson’s extension.
- Otto Lopez drawing trade interest. https://t.co/6vBew6cUpD
Nov 30, 2026, 2:11 PM ET
Drew Rasmussen Signs Three-Year, $60M Extension with Rays
BREAKING: Right-hander Drew Rasmussen and the Tampa Bay Rays are in agreement on a three-year, $60 million contract extension, sources tell ESPN. Rasmussen, 31, is the ace of the American League champions’ rotation and was due to be a free agent after the 2027 season.
— Jeff Passan (@JeffPassan) November 30, 2026
Nov 30, 2026, 2:11 PM ET
Isiah Kiner-Falefa Agrees to Deal With A's
Keith Hernandez
Nov 30, 2026, 1:39 PM ET
Free-agent infielder Isiah Kiner-Falefa and the Athletics agreed to an undisclosed contract on Monday, sources told Jeff Passan of ESPN. The 31-year-old veteran can play all over the field and will join an A's team that is looking to bounce back after a disappointing 2026 season. Kiner-Falefa spent over two months on the injured list in 2026 with the Boston Red Sox due to left-forearm inflammation and appeared in only 66 games, hitting .242/.322/.311 with a .633 OPS, two home runs, 16 RBI, 23 runs scored, and eight stolen bases in 183 plate appearances in his ninth year in the big leagues. He has stuck around in the majors for so long, not because of his bat, but because of his defense and versatility on the diamond. Kiner-Falefa, who won a Gold Glove Award in 2020, has become a dedicated utility player, spending most of his time at second base, third base, and shortstop. The veteran infielder does not have much power at all, but he is proficient at making contact, owning a career 15.3% whiff rate, which is nearly 10 percentage points below the league average (25.0%). The former fourth-rounder by the Texas Rangers in 2013 has a career .261/.311/.347 slash line with a .658 OPS, 38 home runs, 302 RBI, 394 runs scored, and 108 steals in 984 regular-season games played for five different teams. Kiner-Falefa is moving to a hitter-friendly environment, but in a utility role, he will only be worth a bench stash in AL-only formats.--Keith HernandezSource: ESPN.com - Jeff Passan
Jhonkensy Noel Drawing Interest From Multiple MLB Teams
Keith Hernandez
Nov 30, 2026, 1:23 PM ET
Free-agent outfielder Jhonkensy Noel is drawing interest from several major-league teams this offseason, as well as multiple teams in Asia, sources told MLB insider Mike Rodriguez. The Dominican right-handed slugger is expected to reach an agreement as soon as possible. Noel is a free agent this offseason after not appearing in a single major-league game in 2026. In his first two years in the league with the Cleveland Guardians in 2024 and 2025, the 25-year-old hit just .193/.242/.401 with a .643 OPS, 19 home runs, 41 RBI, and 44 runs scored in 136 games and 351 plate appearances. He had 115 strikeouts and only 17 walks in two seasons. Noel was released by the Baltimore Orioles in late July after he was a non-roster invitee to spring training. He hit .121 (13-for-107) with three home runs in 30 games for Triple-A Norfolk before getting injured in late May. He has plenty of pop from the right side, but his high strikeout rate will make it difficult for him to resurface in the big leagues alone, let alone to become fantasy-relevant in 2027.--Keith HernandezSource: Mike Rodriguez
Ildemaro Vargas Signs One-Year Deal With Marlins
Keith Hernandez
Nov 30, 2026, 1:14 PM ET
Free-agent infielder Ildemaro Vargas and the Miami Marlins agreed to a one-year, $3 million contract on Monday, a source told ESPN's Jeff Passan. The Marlins have bulked up their infield with the move to add Vargas, while also signing Javier Sanoja to a seven-year, $65 million contract extension. Vargas, a 35-year-old veteran from Venezuela, had the best year of his MLB career in 2026 in his 10th year in the league with the Arizona Diamondbacks, hitting .254/.298/.377 with a .675 OPS and career highs in home runs (nine), RBI (67), and runs scored (62) in 142 games and 486 plate appearances. He has predominantly played first or second base over the last few seasons in Arizona, but he also has experience at third. The Marlins will be Vargas' sixth franchise since he made his MLB debut in 2017 with the D-backs. He has also played for the Washington Nationals, Chicago Cubs, Minnesota Twins, and Pittsburgh Pirates. The switch-hitting infield utility man should see most of his at-bats against left-handed pitchers in 2027 in South Beach after posting an .847 OPS against lefties and just a .580 OPS against righties.--Keith HernandezSource: ESPN.com - Jeff Passan
Brewers Pursuing Nick Pivetta in Serious Talks
Keith Hernandez
Nov 30, 2026, 2:20 PM ET
Free-agent right-hander Nick Pivetta has not agreed to any deal yet, but the Milwaukee Brewers have emerged as his most aggressive suitor, a source told Mark Feinsand of MLB.com. Returning to the San Diego Padres is also a possibility for Pivetta, who dealt with arm injuries in 2026 that limited him to just eight starts. The 33-year-old veteran from Canada was solid when on the mound for the Friars, though, going 3-2 with a 2.86 ERA, 1.01 WHIP, and 42 strikeouts in 34 2/3 innings pitched during the regular season. The former fourth-rounder by the Washington Nationals had a career year in his first season in San Diego in 2025, going 13-5 with a 2.87 ERA (3.49 FIP) and 0.98 WHIP with 190 strikeouts and 50 walks in 181 2/3 innings across 31 regular-season starts. He became a free agent when the Padres declined his $14 million option for the 2027 season. In his four starts in September, Pivetta looked to be back to his 2025 form, posting a 1.45 ERA, 0.91 WHIP, and 18:2 K:BB in 18 2/3 frames. The Brewers already have one of the best starting rotations in baseball with Jacob Misiorowski, Logan Henderson, Robert Gasser, and Kyle Harrison, but the addition of Pivetta would make the reigning World Series champions even more formidable.--Keith HernandezSource: MLB.com - Mark Feinsand
Javier Sanoja Extended by Marlins
Keith Hernandez
Nov 30, 2026, 12:56 PM ET
The Miami Marlins reached a seven-year, $65 million contract extension with third baseman Javier Sanoja, sources told Jeff Passan of ESPN.com. The 24-year-old Sanoja won a Gold Glove Award in 2025 and is coming off his third season in the majors, in which he had career highs in home runs (11) and RBI (69) while slashing .295/.333/.458 in 144 games played and 490 plate appearances. The deal will buy out his first three years of free agency. The Venezuelan native has previously been used as a utility man for the Fish, but with this extension, he should start to see more regular playing time at the hot corner in Miami in 2027. In his first full season in the majors in 2025, Sanoja hit .243/.287/.396 with a .683 OPS, six home runs, 38 RBI, 40 runs scored, and six stolen bases in 118 games across 342 plate appearances. With more playing time, Sanoja will become a corner-infield option for fantasy managers in deep-mixed leagues next year.--Keith HernandezSource: ESPN.com - Jeff Passan
Blue Jays Exploring Bat, Interested in Brandon Lowe
Keith Hernandez
Nov 30, 2026, 12:47 PM ET
The Toronto Blue Jays continue to explore the market for bats this offseason, and they are still involved with free-agent second baseman Brandon Lowe, according to Ben Nicholson-Smith of Sportsnet. USA Today's Bob Nightengale reported that Toronto was a finalist for infielder Luis Arraez before he signed with the division-rival New York Yankees on Sunday. If the Blue Jays sign Lowe, recent acquisition Jazz Chisholm Jr. would be in line to play more outfield. Lowe, who had a fantastic season in 2026 with the Pittsburgh Pirates, would look really nice from a fantasy baseball perspective at the hitter-friendly Rogers Centre if he returned to the American League East division. The 32-year-old left-handed slugger hit .260/.331/.493 with an .824 OPS, 35 home runs, 96 RBI, 94 runs scored, and two stolen bases across his 584 at-bats with the Pirates, making the two-time All-Star one of the best available bats left on the open market with the Dec. 1 lockout coming quickly. After rejecting Pittsburgh's qualifying offer, the Pirates will receive draft-pick compensation if Lowe signs elsewhere. Lowe offers rare lefty pop at the keystone in fantasy, but he is not without injury risk, and his high career strikeout rate makes him volatile in the batting average department.--Keith HernandezSource: Sportsnet - Ben Nicholson-Smith
Bryan De La Cruz Closing in on Deal to Head to Japan
Keith Hernandez
Nov 30, 2026, 12:39 PM ET
Free-agent outfielder Bryan De La Cruz is closing in on a deal with an unnamed Nippon Professional Baseball team, sources told Francys Romero. De La Cruz became a free agent this offseason when he was non-tendered by the Philadelphia Phillies. In limited action with the Phillies in 2026, De La Cruz hit .280 with a .762 OPS in 86 plate appearances. The 29-year-old Dominican native also had two home runs, 12 RBI, and 10 runs scored in just 34 games played in his sixth year in the big leagues. De La Cruz will head to Japan after slashing .252/.298/.407 with a .700 OPS, 60 home runs, 220 RBI, 187 runs scored, and 15 stolen bases in 525 games with the Phillies, Miami Marlins, Pittsburgh Pirates, and Atlanta Braves. In 2023 and 2024 with the Marlins and Pirates, De La Cruz combined for 40 home runs and 146 RBI while also stealing nine bases.--Keith HernandezSource: Francys Romero
Kenley Jansen Agrees to Deal With Giants
Keith Hernandez
Nov 30, 2026, 12:23 PM ET
Free-agent right-handed reliever Kenley Jansen agreed to a one-year, $9 million deal with the San Francisco Giants on Sunday, pending a physical, sources told The Athletic's Ken Rosenthal and Will Sammon. Jansen will join Camilo Doval and Randy Rodriguez at the back end of the Giants' rebuilt bullpen in 2027. The 39-year-old veteran will enter next season with 498 career saves, setting up the possibility that he will reach the 500-save mark, which has previously only been reached by Mariano Rivera and Trevor Hoffman. His first 350 career saves came with the Los Angeles Dodgers from 2010 to 2021, a span in which he made three All-Star teams while posting a 2.37 ERA. Since his time with the Dodgers, Jansen has been with five different teams, including the Giants, Atlanta Braves, Boston Red Sox, Los Angeles Angels, and Detroit Tigers. From 2022 to 2026, Jansen had a 3.20 ERA, a 1.07 WHIP, and 148 saves, which were the third-most in the majors. He converted 22 of his 28 save chances while posting a 3.20 ERA with 51 strikeouts and 23 walks in 50 appearances (45 innings) last year with the Tigers. Jansen became a free agent this offseason when the Tigers declined his $12 million option for the 2027 season. While he should be considered the favorite to open next season as the closer for San Francisco, Jansen could have a short leash and will be a shaky fantasy closer after struggling in high-leverage situations in 2026.--Keith HernandezSource: NBC Sports - Alex Pavlovic
Luis Arraez Agrees to Three-Year Deal With Yankees
Keith Hernandez
Nov 29, 2026, 11:58 PM ET
Free-agent infielder Luis Arraez agreed to a three-year, $45 million deal with the New York Yankees on Sunday, a source told Mark Feinsand of MLB.com. Arraez will move to the American League East after spending the 2026 season with both the San Francisco Giants and the Philadelphia Phillies. The 29-year-old Venezuelan is a four-time All-Star and three-time batting champion who will give the Yankees a left-handed boost in the heart of their batting order in 2027 and beyond. In 151 total regular-season games with the Gigantes and Phillies, Arraez hit .310/.345/.419 with a .765 OPS, six home runs, 64 RBI, 67 runs scored, and 10 stolen bases in 655 plate appearances in his eighth year in the majors. He will definitely be a boost to the Bombers' batting average after the Yankees had a combined .235 average in 2026, which ranked 26th in the league. Arraez hit .324 for the Giants before being traded to Philly, where he hit only .278 after the trade deadline. He also sat out of the postseason due to a sprained left ankle that he suffered in the final week of the regular season. For fantasy purposes, while the landing spot in the Bronx is not a bad one at all, Arraez will still have limited upside because of his low walk rate and limited power. He had only six long balls this past season, and although he improved on defense at second base in 2026, his defensive metrics for his career leave a lot to be desired. Arraez's contact ability remains his best skill set, as he struck out only 4.3% of the time last year.--Keith HernandezSource: MLB.com - Mark Feinsand
Alec Burleson, Cardinals Agree on Four-Year Contract Extension
Keith Hernandez
Nov 29, 2026, 11:28 PM ET
First baseman Alec Burleson and the St. Louis Cardinals agreed on a four-year, $55 million contract extension on Sunday that includes a fifth-year club option, sources told Jeff Passan of ESPN.com. Burleson, who led baseball with 116 RBI in 2026, will join second baseman JJ Wetherholt as Cardinals players with deals beyond the 2027 season. In his fifth year in the big leagues, Burleson became the Cardinals' everyday first baseman in 2026 and finished with a strong .279/.343/.473 slash line with an .816 OPS, a career-high 26 home runs, 116 RBI, 89 runs scored, and four stolen bases in 160 games played across 670 plate appearances. The new deal buys out Burleson's final two years of arbitration and first two years of free agency. The 28-year-old has become one of the best all-around left-handed hitters in the game after backing up his breakout season from 2025, when he won his first Silver Slugger Award thanks to an .801 OPS and 18 home runs. Since the start of the 2025 season, Burleson's 809 OPS is 34th among qualified hitters and is ahead of Jackson Chourio, Brandon Lowe, and Brice Turang. The former 70th overall pick out of East Carolina now has a .271/.327/.437 slash line in his five MLB seasons with 74 home runs, 302 RBI, and 252 runs scored in 574 regular-season games. Under the hood, fantasy managers should like what they see, as his .374 expected wOBA ranked in the 94th percentile in 2026, and he had better quality of contact at the plate.--Keith HernandezSource: ESPN.com - Jeff Passan
Shota Imanaga Signs Three-Year Deal With Rangers
Keith Hernandez
Nov 29, 2026, 11:13 PM ET
Free-agent left-hander Shota Imanaga agreed to a three-year, $51 million deal with the Texas Rangers on Sunday, a source briefed on the deal told Patrick Mooney of The Athletic. The Japanese southpaw will head to the American League West after spending the first three years of his major-league career with the Chicago Cubs, going 35-21 with a 3.45 ERA (4.32 FIP), 1.04 WHIP, and 465:91 K:BB in 492 1/3 innings pitched over his 86 starts. Imanaga was a first-time All-Star in his first year in the United States, going 15-3 with a career-best 2.91 ERA, 1.02 WHIP, and 174:28 K:BB in 173 1/3 frames across 29 starts for the Cubbies. The 33-year-old southpaw struck out plenty of batters, but he also allowed his fair share of home runs as a fly-ball pitcher at hitter-friendly Wrigley Field. He went 11-10 last year with a 3.77 ERA in 32 regular-season starts. Imanaga's 35 home runs allowed this past season were the second-most in baseball, but he also struck out 174 hitters in 174 1/3 innings. The move to Texas and pitcher-friendly Globe Life Field should make Imanaga a little bit more attractive in fantasy baseball drafts next spring. He will be joining a Rangers starting rotation that already includes Jacob deGrom, MacKenzie Gore, Kumar Rocker, Jack Leiter, and Nathan Eovaldi. In eight seasons in the Japan Central League before joining the Cubs, Imanaga had 74 wins and a 2.96 ERA.--Keith HernandezSource: The Athletic - Patrick Mooney
Michael King Returns to Padres on Four-Year Deal
Keith Hernandez
Nov 29, 2026, 10:39 PM ET
Free-agent right-hander Michael King and the San Diego Padres agreed to a four-year, $108 million contract on Sunday evening, a source told Jeff Passan of ESPN.com. The deal includes an opt-out clause after the second season and an $8 million signing bonus. King will return to San Diego after spending the last three years with the Padres, going 30-22 with a 3.15 ERA (3.86 FIP) and 1.19 WHIP, with 436 strikeouts and 159 walks in 432 innings pitched across 78 regular-season appearances (77 starts). He had a bounce-back season in 2026 after dealing with injuries in 2025, going 12-10 with a 3.21 ERA (4.13 FIP) and a 1.18 WHIP with 159 strikeouts and 70 walks in 185 innings over 32 starts in his eighth year in the big leagues. The 31-year-old veteran opted out of the final two years of a three-year, $75 million contract to become a free agent. In the postseason, King was lights-out, posting a 0.64 ERA in 14 innings. In his first year in San Diego in 2024, King finished seventh in the National League Cy Young voting after recording a 2.95 ERA with a career-high 201 strikeouts in 173 2/3 innings. Adding starting pitching was the Padres' biggest offseason priority, so bringing their ace back is a big win on a day when the team got plenty done. King will be the Padres' ace yet again in 2027, and he should also be a priority target as a high-end starter in fantasy baseball leagues in drafts next spring.--Keith HernandezSource: ESPN.com - Jeff Passan
Seiya Suzuki Agrees to Five-Year Deal With the Padres
Keith Hernandez
Nov 29, 2026, 10:24 PM ET
Free-agent outfielder Seiya Suzuki and the San Diego Padres agreed to a five-year, $110 million deal on Sunday night, a source told MLB.com's Mark Feinsand. The Japanese outfielder spent his first five seasons with the Chicago Cubs, hitting .269/.351/.472 with 113 home runs, 142 doubles, and 382 RBI in 675 games. He was one of only seven right-handed hitters to record at least 110 homers, 140 doubles, 300 walks, and 380 RBI in that span. Suzuki has quietly become one of baseball's most consistent hitters, and he will head to San Diego, where he will give the Friars more pop and outfield depth. Despite suffering a knee injury in the World Baseball Classic in the spring, Suzuki hit 26 home runs and had 86 RBI in the regular season in 2026, and he added career highs in walks (81) and bWAR (5.1) while posting an .841 OPS. He set career highs in homers (32) and RBI (103) in 2025. Not only did Suzuki maintain his consistency at the plate, but he had his best season on defense in his final year in Chicago. He actually had career lows in average exit velocity (88.6 mph) and hard-hit rate (38.9%), although both numbers were around league average. Fantasy managers should not be too concerned about those metrics, as Suzuki maintained an 89th percentile chase rate and 91st percentile walk rate. Suzuki will remain an everyday player in San Diego and will bat in the heart of a strong batting order.--Keith HernandezSource: The Athletic - Ken Rosenthal
Alex Vesia, Mets Agree on Three-Year Deal
Keith Hernandez
Nov 28, 2026, 6:25 PM ET
Free-agent left-handed reliever Alex Vesia and the New York Mets agreed to a three-year, $39 million contract on Saturday, sources told ESPN's Jeff Passan. With Adrian Morejon heading to the Toronto Blue Jays on a record-breaking contract for a reliever, Vesia was the next-best left-handed reliever on the market and will join a Mets team that needed bullpen help. The 30-year-old Vesia heads to Queens after another strong season for the Los Angeles Dodgers as a late-inning setup arm, going 3-1 with a 2.64 ERA (3.10 FIP), 1.07 WHIP, three saves, 74 strikeouts, and 32 walks in 58 relief innings during the regular season in his sixth year in L.A. Vesia and right-hander Darwinzon Hernandez will effectively replace Brooks Raley and A.J. Minter in New York's bullpen going forward. Vesia has established himself over the past half-decade as one of the best left-handed relievers in the game, and he owns a career 2.87 ERA with 443 strikeouts across 332 1/3 innings in 372 appearances. His 2.87 ERA ranks 17th-best among the 277 pitchers to throw at least 300 innings since 2020. His 32.4% strikeout rate ranks seventh-best, and he has an excellent 1.59 ERA in 22 2/3 innings in the postseason. Since 2021, Vesia has thrown at least 40 innings in every season and cleared at least 58 innings in each of the last three seasons. The mix of reliability and strikeout stuff makes Vesia a popular reliever target in fantasy, despite the fact that he is not a closer.--Keith HernandezSource: ESPN.com - Jeff Passan
Mets Sign Carson Benge to Eight-Year Extension
Keith Hernandez
Nov 28, 2026, 6:17 PM ET
Outfielder Carson Benge and the New York Mets agreed to an eight-year, $130 million contract extension on Saturday, a source told Jeff Passan of ESPN.com. Between Benge and outfielder A.J. Ewing, the Mets have locked up both of their young outfielders and signed the best pitcher in baseball (Tarik Skubal) this winter. The Mets are cooking this offseason. The 23-year-old Benge, a first-rounder in 2024 from Oklahoma State, was one of the few bright spots in 2026 in yet another disappointing campaign that ended without a playoff berth. In his first 156 big-league games and 654 plate appearances, Benge hit .282/.346/.430 with a .776 OPS, 20 home runs, 22 doubles, 65 RBI, 22 stolen bases, and 86 runs scored for the Mets. His new deal will buy out the remaining years of team control plus another three years, which means he will stay in Queens through the 2034 season. With All-Star Juan Soto also in the mix, the Mets now have one of the best outfields in baseball as long as they all stay healthy. Benge is in a strong lineup and has plenty of power/speed upside to boot, making him one of the most attractive young fantasy outfield targets in the game going into drafts next spring. It was very encouraging that he hit .279 (48-for-172) with six home runs and 19 RBI in 190 plate appearances against lefties in his first year in the majors.--Keith HernandezSource: ESPN.com - Jeff Passan
Braves Re-Sign Mauricio Dubon to Three-Year Contract
Keith Hernandez
Nov 28, 2026, 6:09 PM ET
The Atlanta Braves announced on Saturday that they re-signed utility man Mauricio Dubon to a three-year deal worth $30 million. Dubon will make $10 million in each of the next three seasons. The 32-year-old veteran from Honduras had the best season of his career with the Braves in 2026, slashing .276/.321/.399 with a .719 OPS and career highs in home runs (12), hits (158), doubles (28), RBI (73), and stolen bases (10) in 153 regular-season games and 619 plate appearances. The Braves acquired him in a trade with the Houston Astros in November of 2025. In addition to his strong campaign at the plate for the Braves, Dubon picked up his third Gold Glove award as a utility player. He could begin the 2027 season as the team's top candidate to start at shortstop after appearing at shortstop, second base, third base, left field, and center field last season. Although Dubon played extremely well across the board in his eighth year in the big leagues, that was essentially his ceiling, and he is not an overly attractive fantasy baseball commodity, outside of his positional versatility. The 2026 campaign was only the second time in Dubon's eight seasons that he reached double digits in home runs, and it was the first time that he had double-digit stolen bases.--Keith HernandezSource: Atlanta Braves
Tyler Mahle Returns to Braves on Two-Year Deal
Keith Hernandez
Nov 28, 2026, 6:00 PM ET
Free-agent right-hander Tyler Mahle and the Atlanta Braves agreed to a two-year, $40 million deal on Saturday, according to Grant McAuley of 929 The Game. Mahle and the Braves will run it back in 2027 and 2028 after the 32-year-old veteran was excellent for Atlanta's starting rotation after they acquired him in a midseason trade from the San Francisco Giants. The former seventh-rounder by the Cincinnati Reds in 2013 was 3-9 with a 5.13 ERA, 1.39 WHIP, and 89:37 K:BB in 94 2/3 innings across 18 starts for the Giants before the trade. After joining the Braves, Mahle was lights-out on the mound, going 4-1 with a 1.99 ERA, 0.96 WHIP, and 48:9 K:BB in 54 1/3 innings and nine starts to close out the regular season. Mahle is set to earn $20 million in each of the next two seasons. In his two postseason starts, he had a 1.35 ERA, allowing only two earned runs in 13 1/3 innings with 10 strikeouts. The Braves were 6-3 in Mahle's nine starts, and his ERA with the Braves ranked seventh in the majors among qualified pitchers in that nine-game span. He has a 46-56 record in his career and a 4.05 ERA in 10 big-league seasons after debuting with the Reds in 2017. Starting pitching was a big offseason need for the Braves, and Mahle will help stabilize the front of the rotation behind ace Chris Sale. Fantasy managers will be hoping that Mahle can pick up where he left off in Atlanta next year.--Keith HernandezSource: 929 The Game - Grant McAuley
More News About Giancarlo Stanton
RADIO


